Final Decision Executive Summary Public Notice Evidence Full Application and Section 92 Information Application - Documentation Introduction Application - Land Requirement Plans Application - NOR_Waikato_DC_Final Application - NOR_Waipa_DC_Final Application for Resource Consents - Final Application - Waikato Expressway Cambridge Section AEE FINAL Application - Appendix 1 Consultation report_FINAL Appendix 1 - Materials Displayed at the First Information Day Appendix 1 - full_set_of_posters_lowres Part 1 (pages 1-13) Part 2 (page 14-19) Appendix 1 - Plot_FINAL_lowres Appendix 1 - NZTA_Waikato Expressway FAQ's Appendix 1 - NZTA Cambridge Section Info Flyer Appendix 1 - feedback form Appendix 1 - 2007 June Newsletter Cambridge Bypass Appendix 1 - 2008 March Newsletter Cambridge Bypass Appendix 1 - 2010 July Newsletter Waikato Expressway Cambridge Section Appendix 1 - Schedule of Iwi Consultation Appendix 1 - Signed MOU iwi 101006 Application - Appendix 2 - Cambridge LVUDA final 21.12.10 Appendix 2 - Scheme Montages Appendix 2 - UD - Prelim Design Philosophy Appendix 2 - Site maps Appendix 2 - Site Photos Appendix 2 - Scheme Drawings 1 Appendix 2 - Cross Sections Application - Appendix 3 - Waikato Expressway Cambridge Traffic Assessment_FINAL Part 1 (pages 1-42) Part 2 (pages 42-81) Application - Appendix 4 - Cambridge Section AEE Archaeological Assessment_FINAL Part 1 (pages 1-35) Part 2 (pages 36-70) Application - Appendix 5 - Cultural Effects Report_FINAL Application - Appendix 6 - WECS - Noise assessment - Final Report Application - Appendix 7 - WEW_VibrationReport_261647_Dec2010_FINAL Application - Appendix 8 - Air Quality Assessment_FINAL Application - Appendix 9 - Final Effects Report Cambridge Bypass _08 Dec 2010_ Appendix 9 - Perculation Test BH M26 Appendix 9 - Perculation Test BH M27a Appendix 9 - Perculation Test BH M27b Appendix 9 - Perculation Test BH N29 Appendix 9 - Perculation Test BH P2 Appendix 9 - Perculation Test BH P2a Appendix 9 - Perculation Test BH S7 Appendix 9 - Perculation Test BH T21 Appendix 9 - Revised Groundwater Levels Plot Appendix 9 - Bore Info 1713496 - Map of bores 1.5km radius of S15294-664 Upper - 1 - EWDOCS Appendix 9 - Bore Info 1713499 - Bore report 1.5km radius of S15294-664 Upper - 1 - EWDOCS Appendix 9 - Bore Info 1713510 - Map of bores 1.5km radius of T15304-645 Lower - 1 - EWDOCS Appendix 9 - Bore Info 1713511 - Bore report 1.5km radius of T15304-645 Lower - 1 - EWDOCS Appendix 9 - Filtration calculations Appendix 9 - Wetland and conveyance calculations Appendix 9 - Stormwater System Appendix 9 - Stormwater system at southern interchange Appendix 9 - Karapiro Stream Data Appendix 9 - Karapiro Stream Bridge Drawings Appendix 9 - Culvert Calculations Appendix 9 - Stormwater Mngt Overview Drawings Appenidx 9 -Erosion and Sediment Plan ESCP Drawing reference Appenidx 9 -Erosion and Sediment Plan - Cambridge USLE Sept 10 Appenidx 9 -Erosion and Sediment Plan - App 3 Project Plan Appendix 9 -Erosion and Sedimentation Control Plan Appendix 9 - Typical Outlet/Inlet Drawings Appendix 9 - Final Effects Report Cambridge Bypass _08 Dec 2010_ Application - Appendix 10 - Waikato Expressway Cambridge Ecology Assessment_FINAL Application - Appendix 11 - Cambridge Social Impact Assessment Final Application - Appendix 12 - Assessment of Relevant Statutory Documents_FINAL Application - Scheme drawings Part 1 (pages 1-41) Part 2 (pages 42-81) Application Letter Further comments re discussions in relation to project Section 92 further information Section 92 further information - Archaeological Investigation of PA (S15/66) along proposed alignment of Cambridge Bypass Part 1 (pages 1-28) Part 2 (pages 29-56) Part 3 (pages 57-84) Part 4 (pages 85-112) Part 5 (pages 113-137) Section 92 further information - Plan of areas excluded from archaeological walkover Section 92 further information - Geophysical surveys to determine extent of Maori archaeological sites Part 1 Part 2 Part 3 Part 4 Part 5 Part 6
Final Decision
Executive Summary Public Notice
Evidence
Full Application and Section 92 Information